Aker Solutions to Develop Carbon Capture Terminal for Celsio at Port of Oslo
Aker Solutions has been awarded a front-end engineering and design (FEED) contract by Hafslund Oslo Celsio to develop a CO2 terminal for intermediate storage and export at the port of Oslo, Norway.